Last week, Michael put together a project list for us, just so we know the things we want to do, and when we hope to achieve them by. Most of the things on this require us to have some decent cash on hand so who knows if the timeline is all that accurate, but it’s nice to have a general idea.
Project Name Timeline
I. Interior – 1st Floor
1.
2. Hardwood floor refinishing – master bed Summer 2011
i. Pick out floor finish type and rug
3. Closet expansion – master bed Summers 2011-12
i. Window move
4. Sliding/French door installation – master bed Summers 2011-12
5. Screened-in porch addition Summers 2011-12
i. Connection to existing deck, stain to match
6. Bathroom tile replacement – master bath Fall 2011
i. Replace shower tile and dual head locations
ii. Heated floor installation
i.
ii. Stovetop/oven
8. Front/master bedroom lighting replacement Summer – Fall 2011
i. Install sconces and new overhead can lighting with dimmers
9. Front bedroom closet door replacement Fall 2011
10. Guest bath remodel TBD
II. Interior – Basement
1. Guest room egress window installation Summer 2012
2. Guest room bath/closet conversion Winter - Spring 2012
i. Plumbing to code/match
3. Move furnace to maximize basement space Summer 2013
i. Shift interior wall to fit
4. Change lighting scheme – power lead locations Summer 2011
III. Exterior – Front/garage
1. Epoxy coat garage floor Fall 2012
2. Remove rear garage doors and cover Fall 2011-Summer 2012
3. Build work area in garage rear Winter 2012
IV. Exterior – Back
1. Flower bed/planter box replacement Summer 2011
2. Tree/hasta removal Summer 2011
3. Misc. landscaping and edging Summer 2011
V. Large Projects
1. Main floor expansion Summers 2012-2013
i. Kitchen build-out and remodel
ii. Dining room build-out and remodel
iii. Mud room build-out
iv. Family room interior insulation and build-out
• 2-way fireplace installation
2. Roof remodel Summer 2013
VI. Misc. Projects
1. Dining room lamp – remove chain links Fall 2011
2. Outside dog house Spring 2012
3. Dog door Spring 2012
As you can see, this is quite the list. But we've already accomplished some of them so I crossed them off. I'll give updates every few months. We certainly have our work cut out for us! This weekend will entail:
1. Painting the hallway
2. Yard Work
3. Finish unpacking
Happy Projecting!!!!